Simultaneous Evacuation

If you’re looking for the safest and most cost-effective way to support a temporary change to a ‘simultaneous evacuation’ strategy in blocks of flats undergoing remedial cladding work, we have the solution.

Replacing combustible external wall systems is now a top priority, but ensuring residents are safe from fire before, during and immediately after remedial work is completed, presents many challenges.

Our approach ensures you’re following the National Fire Chiefs Council recommendations for best practice as well as ensuring easy conversion to the BS 8629 code of practice after the stay put policy is reinstated.

Following agreement with a competent person that installing a ‘common fire alarm’ is the right solution for the building, a BS 5839 Part 1, category L5 fire alarm system should be fitted – before cladding removal starts.

Advanced’s MxPro 5 fire panels are fully compliant with all the required standards and deliver unrivalled performance, quality and ease of use.

Intuitive programming, comprehensive cause and effect, powerful diagnostic features and compatibility with four leading detector protocols bring the highest levels of protection for residents – and peace of mind for you.

Once cladding removal is complete, returning your building to ‘stay put’ status is easy.

As our EvacGo evacuation alert panel is designed using MxPro 5 technology, swapping your fire alarm system to an evacuation alert system couldn’t be simpler – whether you’re using wired, wireless or hybrid devices.

For further guidance or to discuss the specific requirements for your site, contact EvacGo@advancedco.com and we’ll help you to create a fully-compliant solution that seamlessly takes you from ‘stay put’ policy to ‘temporary simultaneous evacuation’ and back again.

Documentation

Fire Safety in High-Rise Buildings E-Book

Featured Articles

Building having cladding removed
Features

Fire Safety in Buildings Awaiting Cladding Replacement: Waking Watch vs Fire Alarm System

Effectively supporting a temporary change of evacuation strategy from ‘stay put’ to ‘simultaneous evacuation’ requires the introduction of interim fire…
Read MoreRead more about Fire Safety in Buildings Awaiting Cladding Replacement: Waking Watch vs Fire Alarm System
High Rise residential building with smoke
Features

Fire safety for tall buildings: meeting BS 8629 with confidence

In the wake of the Grenfell tragedy, the fire industry had a duty to respond. Meaningful change was required and…
Read MoreRead more about Fire safety for tall buildings: meeting BS 8629 with confidence
22 Bishopsgate, City of London
Features

Emergency Evacuations: Are You Prepared?

As our buildings and the way in which we put them to use become more complex, the challenges of safely…
Read MoreRead more about Emergency Evacuations: Are You Prepared?
Back to Top Arrow pointing up